Homepage ASD-Network

MoD Australia News - Category: Defence

Government Approves Additional Armoured Personnel Carriers

Featured Events

Network Centric Warfare

Date: 27 Jan 2009 - 30 Jan 2009
Location: Washington, DC, United States


Future Naval Plans Asia Pacific

A Strategic Overview of the Asian Naval Plans and Requirements for the 21st Century Maritime Battlespace

Date: 24 Feb 2009 - 26 Feb 2009
Location: Singapore, Singapore



Featured Reports

Active RFID and Sensor Networks 2008-2018


Corporate Review - General Dynamics Corporation


PEST Analysis - Aerospace and Defence Sector in India



Search Companies

Find over 9000 Aerospace, Aviation, Space, Defence & Security companies & organisations.

The Minister for Defence, the Hon. Joel Fitzgibbon MP, today announced that the Government has approved a $220 million project to upgrade 81 additional M113 Armoured Personnel Carriers (APC) to improve the protection, mobility and firepower of the Australian Army.

LAND 106 is already delivering 350 upgraded M113 APC vehicles. This project is now back on track and delivering a reliable vehicle that provides increased firepower, protection and mobility.

The Government has decided to upgrade an additional 81 APCs to improve the capability of the Army's Mechanised Infantry units, 7 RAR, a recently established battalion, and 5 RAR, both of which are currently based in Darwin.

"These high priority upgrades will provide improved protection, mobility and firepower to Australian soldiers, allowing missions to be carried out more efficiently, safely and effectively," Mr Fitzgibbon said.

These enhancements will include the stretching of the M113 vehicles, add-on armor kit, spall liners, the addition of a new Australian designed and built turret and new weapon, replacement of the drive train and suspension and the adoption of measures to improve the comfort of troops in the vehicle such as heat mitigation measures and better stowage of equipment.

"The increased number of vehicles to be upgraded by BAE Systems Australia will see the production line at the Bandiana production facilities in northern Victoria remain open until July 2011," Mr Fitzgibbon said.

Source : MoD Australia


Recent News from MoD Australia

ASD Network • the smart network • contact usterms & conditionsprivacy policyadvertisingfaqs